How Reliatic calculates remaining life

Every example below can be redone with a calculator. The same inputs run through the calculation engine in an automated test, so a number on this page that the engine does not return fails the build. The method follows API 510/570 practice. It supports, and does not replace, the judgement of a qualified inspector.

The rules in short

  • Thickness is in mm, rates in mm/y, life in years. A year is 365.25 days.
  • The short-term rate uses the last two readings. The long-term rate uses the first and the last. The higher rate governs.
  • Remaining life = (last thickness − t-min) ÷ governing rate. Next inspection = half the remaining life, within the maximum for the equipment: 10 y for a pressure vessel; 5 y or 10 y for piping, and 5 y when the piping class is not recorded; 5 y when no code is recorded.
  • A CML with one reading has no measured rate. The interval cannot be longer than 5 y until the second reading.
  • A missing t-min is never read as 0 mm. A reading dated in the future, or above 1000 mm, is left out and counted. Two readings on one day: the lowest governs.
  • A rate under 0.001 mm/y is measurement noise. Reliatic flags a reading that rose by more than 0.5 mm. It does not read it as no loss.

Calculation engine revision 1.5.0 (2026-11-25). See the changelog for earlier revisions.

1. Steady loss, two readings

The basic case: one rate, one remaining life, half of it as the interval.

Inputs of example 1
Reading dateThickness (mm)
2020-01-0111.00
2024-01-0110.00

Example vessel · nominal 12.0 mm · t-min 6.0 mm

  1. Rate = (11.0 − 10.0) mm ÷ 4.00 y = 0.25 mm/y
  2. Remaining life = (10.0 − 6.0) mm ÷ 0.25 mm/y = 16.0 y
  3. Next inspection = min(16.0 ÷ 2, 10) y = 8.0 y after the last reading

Remaining life 16.0 y, next inspection in 8.0 y

2. The short-term rate governs

Corrosion has sped up: the rate from the last two readings is the higher one.

Inputs of example 2
Reading dateThickness (mm)
2016-01-0111.00
2020-01-0110.64
2024-01-019.80

Example vessel · nominal 12.0 mm · t-min 7.4 mm

  1. Short-term rate = (10.64 − 9.80) mm ÷ 4.00 y = 0.21 mm/y
  2. Long-term rate = (11.00 − 9.80) mm ÷ 8.00 y = 0.15 mm/y
  3. The higher rate governs: 0.21 mm/y
  4. Remaining life = (9.80 − 7.40) mm ÷ 0.21 mm/y = 11.4 y
  5. Next inspection = min(11.4 ÷ 2, 10) y = 5.7 y

Remaining life 11.4 y, next inspection in 5.7 y

3. The long-term rate governs

The wall lost most early on and has slowed: the long-term rate is still the higher one.

Inputs of example 3
Reading dateThickness (mm)
2016-01-0112.00
2020-01-0110.40
2024-01-0110.00

Example vessel · nominal 12.0 mm · t-min 7.0 mm

  1. Short-term rate = (10.40 − 10.00) mm ÷ 4.00 y = 0.10 mm/y
  2. Long-term rate = (12.00 − 10.00) mm ÷ 8.00 y = 0.25 mm/y
  3. The higher rate governs: 0.25 mm/y
  4. Remaining life = (10.00 − 7.00) mm ÷ 0.25 mm/y = 12.0 y
  5. Next inspection = min(12.0 ÷ 2, 10) y = 6.0 y

Remaining life 12.0 y, next inspection in 6.0 y

4. The code maximum sets the interval

A long remaining life does not mean a long interval.

Inputs of example 4
Reading dateThickness (mm)
2020-01-0111.60
2024-01-0111.40

Example vessel · nominal 12.0 mm · t-min 6.0 mm

  1. Rate = (11.6 − 11.4) mm ÷ 4.00 y = 0.05 mm/y
  2. Remaining life = (11.4 − 6.0) mm ÷ 0.05 mm/y = 108.0 y
  3. Half the remaining life is 54.0 y, which is more than the maximum for a vessel (10 y)
  4. Next inspection = min(54.0, 10) y = 10.0 y

Remaining life 108.0 y, next inspection in 10.0 y (the maximum)

5. Piping with no class recorded

The same numbers on a process line: the maximum is shorter, and 5 y is used when the piping class is not recorded.

Inputs of example 5
Reading dateThickness (mm)
2020-01-0111.00
2024-01-0110.00

Example process line · nominal 12.0 mm · t-min 6.0 mm

  1. Rate = (11.0 − 10.0) mm ÷ 4.00 y = 0.25 mm/y
  2. Remaining life = (10.0 − 6.0) mm ÷ 0.25 mm/y = 16.0 y
  3. Half the remaining life is 8.0 y; the maximum for piping with no class recorded is 5 y
  4. Next inspection = min(8.0, 5) y = 5.0 y

Remaining life 16.0 y, next inspection in 5.0 y (the maximum)

6. No wall loss

Equal readings give no rate, so there is no remaining life to quote.

Inputs of example 6
Reading dateThickness (mm)
2016-01-0110.00
2020-01-0110.00
2024-01-0110.00

Example vessel · nominal 12.0 mm · t-min 6.0 mm

  1. Rate = (10.0 − 10.0) mm ÷ 4.00 y = 0.00 mm/y
  2. A rate under 0.001 mm/y is measurement noise, not wall loss
  3. No remaining life and no retirement date; the interval is the maximum for a vessel, 10.0 y

No wall loss measured. No remaining life is shown; next inspection in 10.0 y

7. A reading that rose

A wall does not grow. A rise of more than 0.5 mm is flagged instead of read as no loss.

Inputs of example 7
Reading dateThickness (mm)
2020-01-019.50
2024-01-0110.20

Example vessel · nominal 12.0 mm · t-min 6.0 mm

  1. Rate = (9.5 − 10.2) mm ÷ 4.00 y is negative, and a negative rate counts as 0.00 mm/y
  2. The rise, 0.7 mm, is more than 0.5 mm, so the CML is marked Check readings
  3. No remaining life is quoted until the readings are checked
  4. A CML marked Check readings is inspected again within 1 year

Check readings. No remaining life is shown; inspect again within 1 year

8. Below t-min

A wall at or below t-min has no remaining life and is due now.

Inputs of example 8
Reading dateThickness (mm)
2020-01-018.00
2024-01-016.90

Example vessel · nominal 12.0 mm · t-min 7.0 mm

  1. Last reading 6.9 mm is below t-min 7.0 mm
  2. Remaining life = 0.0 y; the retirement date is the date of the last reading
  3. Next inspection = 0.0 y: due now

At or below t-min. Remaining life 0.0 y, due now

9. A single reading

One reading is not enough for a rate.

Inputs of example 9
Reading dateThickness (mm)
2024-01-0111.20

Example vessel · nominal 12.0 mm · t-min 8.0 mm

  1. One reading gives no rate: two readings, on different days, are needed
  2. Reliatic shows Not calculable: needs at least 2 readings
  3. Until the second reading the interval cannot be longer than 5 y

Not calculable: needs at least 2 readings

10. A single reading with an in-service date

With the nominal thickness and the date the equipment entered service, the rate is estimated and labelled as estimated.

Inputs of example 10
Reading dateThickness (mm)
2024-01-0111.20

Example vessel · nominal 12.0 mm · t-min 8.0 mm · in service 2016-01-01

  1. Estimated rate = (12.0 − 11.2) mm ÷ 8.00 y in service = 0.10 mm/y
  2. Remaining life = (11.2 − 8.0) mm ÷ 0.10 mm/y = 32.0 y
  3. Half the remaining life is 16.0 y; with one reading the interval is capped at 5.0 y

Estimated: remaining life 32.0 y, next inspection in 5.0 y (capped, one reading)

11. t-min missing

A missing t-min is never read as 0 mm.

Inputs of example 11
Reading dateThickness (mm)
2020-01-0111.00
2024-01-0110.00

Example vessel · nominal 12.0 mm · no t-min recorded

  1. Remaining life = (10.0 − t-min) mm ÷ rate, and t-min is not recorded
  2. Reading it as 0 mm would give a long and false remaining life, so nothing is calculated
  3. Reliatic shows Not calculable: t-min missing

Not calculable: t-min missing

Want to check the numbers on your own data? Follow the six-check evaluation or open the sample files.