Risk-based inspection screening
Short answer
Risk-based inspection plans inspection by risk: probability of failure times consequence of failure. Reliatic places each asset on your own 5 × 5 matrix, takes probability from the thinning damage factor for the inspection effectiveness you record, and needs a separate reviewer and a named approver. It follows API 510/570 practice for remaining life and next inspection date.
Decide where to look first, on a matrix you set up.
Place each asset on your organization's 5 × 5 risk matrix. Probability comes from the thinning damage factor for the inspection effectiveness you record; the engineer enters the consequence. A reviewer who is not the assessor checks it, and a named approver accepts the residual risk.
For reliability and inspection engineers who need to decide where the inspection effort goes, and for the managers who accept the risk.
What ships today
- A 5 × 5 likelihood × consequence matrix, set per organization and versioned
- Thinning damage factor from the remaining thickness ratio and the inspection effectiveness A to E
- Consequence entered by the engineer. Reliatic does not model consequence of failure
- Inherent and residual risk on each assessment
- The reviewer must be a different person from the assessor. Approved assessments are frozen
- Risk acceptances with a named approver and a valid-until date
The calculation
- Risk band = the cell for likelihood × consequence on your matrix
- Thinning damage factor by remaining thickness ratio and inspection effectiveness
A qualitative screen that follows risk-based inspection concepts. Not a quantitative RBI model and not certified to any standard.
In detail
Questions
What is risk-based inspection?
Risk-based inspection (RBI) plans inspections by risk. Risk combines the probability of failure and the consequence of failure, and the inspection effort goes to the assets with the highest risk.
Is this a full quantitative RBI?
No. Reliatic screens risk on a qualitative matrix. The consequence is entered by the engineer, and the qualified inspector makes the decision.
Is Reliatic certified to an RBI standard?
No. Reliatic is not certified to any standard. It shows the formula behind each number, and it does not replace the qualified inspector or the competent person.
How much does RBI save?
No fixed percentage applies to every plant. The result depends on the plant, its data and its damage mechanisms. We do not publish a savings figure without a source.