Definition

A two-dimensional grid that combines Probability of Failure (PoF) on one axis and Consequence of Failure (CoF) on the other to produce a visual risk ranking. The matrix divides risk into categories (typically A through E or Low/Medium/High/Very High/Extreme) that determine inspection priority, interval, and strategy. Risk matrices provide a standardized framework for comparing and prioritizing risks across diverse equipment populations.

Guide

Context

The primary visualization for RBI programs. Risk matrices are displayed in Reliatic's RBI module as both list views and interactive matrix plots. Equipment position on the matrix drives inspection planning decisions — items in the upper-right (high PoF, high CoF) receive the most attention.

Examples

  1. A 5x5 risk matrix places a heat exchanger at PoF=4, CoF=3, resulting in a risk ranking of C (medium-high), with a recommended inspection interval of 24 months.
  2. After implementing a corrosion monitoring program, the heat exchanger moves from PoF=4 to PoF=2 on the risk matrix, reducing the risk ranking from C to A (low).

Applicable Standards

  • API 580
  • API 581
  • ISO 31010:2019

Related Terms

Probability of Failure(PoF)

A quantitative or semi-quantitative measure of the likelihood that an equipment item will fail within a specified time period. PoF is determined by the generic failure frequency of the equipment type, modified by damage factors that account for specific active degradation mechanisms, and adjusted by a management system factor reflecting the quality of the facility's integrity management program.

Consequence of Failure(CoF)

A measure of the impact resulting from an equipment failure, encompassing safety (personnel injury/fatality), environmental (release to atmosphere/ground/water), production (lost throughput and business interruption), and equipment (repair/replacement cost). CoF is evaluated based on the worst credible release scenario, considering fluid properties, operating conditions, detection and isolation systems, and the surrounding environment.

Risk Ranking

A categorical classification (typically A through E) derived from the risk matrix that represents the combined probability and consequence of failure for an equipment item. Risk ranking determines the urgency and extent of inspection, monitoring, and maintenance activities. Rankings are typically: A (lowest risk) through E (highest risk), each with prescribed inspection strategies and maximum interval limits.

Risk-Based Inspection(RBI)

A methodology that uses risk assessment to prioritize and plan inspection activities for pressurized and other equipment. RBI combines Probability of Failure (driven by damage mechanisms and equipment condition) with Consequence of Failure (driven by process hazards and safety impact) to rank equipment by risk and allocate inspection resources where they will have the greatest impact on risk reduction.

Risk Score

A numerical value representing the level of risk for an equipment item, calculated as the product of Probability of Failure and Consequence of Failure scores. Risk scores provide a continuous scale (1-25 in a 5x5 system) that enables granular prioritization within risk ranking categories and supports quantitative risk trending over time.

Where this appears in Reliatic

This concept is used in the FMEA & Risk module.