Quick Start Guide
Get Running Fast.
This guide walks you through setting up your Reliatic account, importing your first assets, and running an initial risk-based inspection (RBI) analysis. You'll be operational quickly, depending on data readiness.
Account Setup
Create Your Account
Navigate to reliatic.com/login and click 'Sign Up'. Enter your work email, create a password, and verify your email address.
Organization Setup
Enter your company name, primary facility location, and industry sector. This helps us configure appropriate risk models and regulatory frameworks.
User Permissions
Set up your team structure. Assign roles: Admin (full access), Engineer (edit assets & run analyses), Viewer (read-only reporting).
First Asset Import
Reliatic supports multiple import methods. For your first import, we recommend starting with a small batch (10-50 assets) to validate the process.
CSV/Excel Upload
Most common method. Use our template to map your existing asset data.
API Integration
Connect directly to your CMMS or ERP system for scheduled synchronization.
{
"asset_id": "V-102",
"description": "Crude Stabilizer Column",
"equipment_type": "pressure_vessel",
"design_pressure_psi": 350,
"design_temp_f": 450,
"material": "SA-516-70",
"year_installed": 2018,
"process_fluid": "crude_oil"
}Download Template
Navigate to Dashboard > Assets > Import. Download the CSV template pre-configured with required fields.
Map Your Data
Fill in asset IDs, equipment types, design conditions, materials, and process service. Minimum 8 fields required for basic RBI.
Upload & Validate
Upload your CSV. Reliatic validates data quality and flags any missing critical fields. Fix errors and re-upload.
Running Your First RBI
Once assets are imported, run an initial risk assessment using API 581 methodology.
Select Analysis Scope
Go to Dashboard > RBI Analysis. Select 'All Assets' or filter by unit/area. Choose risk methodology (API 581, ISO 31000).
Configure Parameters
Set consequence factors (financial, safety, environmental). Define inspection effectiveness levels. Adjust management system factors.
Execute Analysis
Click 'Run RBI Analysis'. Processing time varies by dataset size and configuration. Live progress indicator shows calculation status.
Review Results
View risk matrix, high-risk asset list, and recommended inspection priorities. Export PDF reports for management review.
What You'll See
- 5x5 risk matrix with asset distribution across categories
- Ranked list of highest-risk assets requiring immediate attention
- Recommended inspection methods and intervals for each asset
- Detailed damage mechanism analysis and degradation rates
Next Steps
Import Inspection History
Add historical thickness readings, NDE results, and corrosion rates to refine risk calculations.
Configure Integrations
Connect to your CMMS, process historian, or condition monitoring systems for scheduled data refreshes.
Customize Risk Models
Adjust damage mechanism weights, consequence factors, and inspection effectiveness for your facility.
Schedule Training
Book a live session with our engineering team to deep-dive on advanced features and best practices.