Reliatic replaces the human middleware of spreadsheets and email chains with a deterministic execution loop. Every detected risk produces a governed, time-bounded, accountable resolution—or the system escalates until one exists.

The Reliability-to-Action Loop

Four stages. Deterministic execution. No optional exits.

01
DETECT

Automatic Risk Detection

The FMEA is not a document—it is a live object. When a risk score exceeds the tenant threshold, an inspection window is missed, or a time-bound waiver expires, the platform fires a Governance Event automatically. No triage queue. No manual review.

Risk Event Fired
trigger: RPN_THRESHOLD_EXCEEDED
asset: V-2041 (HP Separator)
score: 312 / threshold: 200
action: GOVERNANCE_EVENT_CREATED
02
LOCK

The Governance Lock

The asset enters a Locked state. Operational workflows—inspection sign-off, work order creation, risk closure—are blocked until the finding is formally addressed. There is no 'snooze' or 'acknowledge without action' path available to any role.

Asset State Transition
asset.state: ACTIVE → LOCKED
blocked_workflows:
  - inspection_closure
  - work_order_creation
  - risk_acceptance
unlock_requires: governed_artifact
03
RESOLVE

Forced Governed Resolution

To unlock, the engineer must create a Governed Artifact: a Mitigation Action (with named owner, hard deadline, and verification criteria) or a Risk Acceptance (with executive justification, approver signature, and expiry date). The gate validates completeness before unlocking.

Artifact Gate Check
artifact_type: MITIGATION_ACTION
owner: j.eriksson@company.com
deadline: 2026-04-15
criteria: 'UT reading ≥ 5.2mm at CML-07'
status: GATE_PASSED → ASSET_UNLOCKED
04
ESCALATE

Automatic Escalation on Miss

If a Mitigation Action becomes overdue or a Risk Acceptance expires, the system re-opens the Governance Event and escalates to the management tier. The loop restarts—automatically, with full audit trail continuity from the original event.

Escalation Trigger
event: ACTION_OVERDUE
original_deadline: 2026-04-15
escalation_level: 2 → MANAGEMENT
notified: vp_integrity@company.com
status: GOVERNANCE_EVENT_REOPENED

The Ten-Step Integrity Lifecycle

The loop operates within a complete integrity management lifecycle. Every step requires verified completion before the next opens.

Step 1
Identify
Step 2
Assess
Step 3
Plan
Step 4
Approve
Step 5
Execute
Step 6
Verify
Step 7
Document
Step 8
Review
Step 9
Close
Step 10
Learn

Why Traditional Programs Fail at Step 4

The approval gate (Step 4) is where most reliability programs collapse. Work plans exist, risks are scored, budgets are allocated—but the approval decision lives in someone's inbox. Reliatic enforces Step 4 as a hard gate with named approver, timestamp, and documented rationale. No approval, no execution unlock.

Passive Tracking vs. Active Enforcement

The difference is not a feature—it is a design philosophy.

Spreadsheet / Legacy CMMS
Reliatic
Dashboard shows overdue items
Platform locks workflows until resolved
Spreadsheet tracks risk scores
Engine enforces score-triggered governance
Email alerts sent to responsible party
Automatic escalation to next authority level
Risk acceptance recorded in a field
Formal waiver with expiry, approver, and auto-reopen
Audit trail reconstructed from CMMS exports
Immutable cryptographic audit log—always ready
Inspection schedule from calendar intervals
Dynamic schedule driven by live risk score changes

See It Running on Your Asset Types

Request a live walkthrough with your actual damage mechanisms, risk thresholds, and governance hierarchy. We configure the demo to your context, not a generic template.