Definition

A predefined hierarchy of responsibility that determines who is notified and in what order when an issue exceeds the authority or capability of the current handler. Escalation chains ensure that critical issues receive attention from increasingly senior or specialized personnel, with defined time limits for response at each level.

Context

In Reliatic, escalation chains are configured for risk threshold breaches, overdue inspection actions, and unresolved critical findings. They ensure that no critical item falls through the cracks by automatically escalating to the next level if not addressed within the defined timeframe.

Examples

  1. A critical RPN (>=500) triggers an escalation chain: immediate notification to asset engineer (Level 1), escalation to reliability manager if no action within 48 hours (Level 2), and escalation to plant manager if no action within 7 days (Level 3).
  2. An overdue inspection action escalates from the inspector (Day 0) to the inspection coordinator (Day +7) to the asset integrity manager (Day +14) to the plant manager (Day +30).